Cost Estimating
KEI develops preliminary capital cost estimates based on
conceptual design elements. These estimates are refined as the design develops. Final cost estimates are created based on final design documents and by developing the crews, equipment, and
production rates that a construction contractor would reasonably
use to execute the construction of the project.
This approach ensures the cost estimates contain the appropriate
level of detail for all crews, equipment, and production rates
which provide a built-in assurance that the project can be
built at the estimated price. It also ensures the cost estimate
can be used as the basis for developing an owner’s as-planned
schedule, and allows the estimate to be used as a baseline for
reasonable as-planned prices and as-planned production rates.
These estimates prove valuable should any claims or change orders arise during the course of
the work.
The types of Estimates we have developed include the following:
| • claims and change order estimates |
| • conceptual estimates |
| • estimate reviews |
| • feasibility study estimates |
| • independent check estimates |
| • life cycle cost estimates |
| • value engineering estimates |